🛒 0
×

Your chosen CVs

No CV in your cart yet

Program/ project manager, Product owner, Engineer

Novi Sad
You can open access to the talent’s contacts for only 2 euro!

Пожалуйста, войдите, чтобы скачать резюме.

Location:

Novi Sad

Birthday date:

07/03/1979

Experience level:

Education level:

Неоконченное высшее / Incomplete higher

Languages:

About

16 years of experience in Electronics (Production, product R&D) and Automotive (Production, Logistics, Quality, TPM, Lean)

Work experience

LG Electronics Program Manager – Control of Major Project milestones of TCU ERA GLONASS projects (Telematic Control Unit) – Organization of communication between Teams of Developers (Seoul), Testing Laboratory and Customer Representatives in Moscow (GM Russia) – Clarification of GOST clauses, translation, preparation of other accompanying documents – Preparation of preliminary tests – Preparation of certification tests – Support of Field Tests activity -Provide technicals details about test results with programming logs, paramiters, reports written, video and photos materials – Support for the Emergency Calling Device Development Team (SW, HW Team) – Documents preparation for Custom clearance (samples, components, testing equipment) August 2016/ November 2022
RSRC NAMI Moscow, nami.ru Senior planning manager – Preparation of the calendar plan and its coordination with the leaders of other areas – Definition of the list and status of the work under the control points of the Master Plan of the Project – Analysis and forecast of the number, as well as the assessment of the cost of resources required for the project – Analysis of deviations from the plan, adjustment of the plan, and its coordination with the project participants. – Monitoring the preparation and approval of design documentation – Determination of the method and scheme of interaction between the participants of the Project Team – Preparation of the draft budget directions and the subsequent cost control – Monitoring the execution of orders under the protocols – Support components purchasing activities November 2014/ August 2016
Continental Automotive Automotive Business — Auto Parts and Components (Manufacturing) Project Manager (New product launch) – Define operations Project Targets (financial, scheduling, and scope) = qualitytriangle – Coordinate the new project launch process in the plant, including the plant-related APQP/PPAP process – Develop and maintain the Operations Plan by the valid processes – Preparation of FMEA documentation – Coordinate the new project launch process in the plant, including the plant-related APQP/PPAP process – Support TPM preparation plan – Maintain, provide and follow up on open issues of new projects and keep the plant informed of design changes before SOP – Ensure other costs Labor, and ramp-up costs are per the approved – Eliminate/ Minimize Excess and Obsolete Material associated with the product change/launch – Ensure compliance with Lean concepts, robust processes – Project Management of line industrialization that meets cycle time, product, and process requirements indicated by Customer – Regularly report the Operations project status by the valid tool and process set – Escalate issues to Global Project Manager and Operations management, affected Quality, Suppliers, and Customers – Development of a process for evaluating changes in the manufactured product August 2012/ November 2014
Benteler Automotive Kaluga, benteler.de Automotive Business — Auto Parts and Components (Manufacturing) Lean Production Specialist – Developing and supporting technological processes in all plant areas – Make changes in technological processes – Teaching staff by Lean Operation System, 5S, Lean Principles, and other education programs – Searching for a “bottleneck” (problem area) at the plant – Calculate the potential for optimization, optimization of line tack time – Optimize logistic flow – Improve visualization in the production and logistics area – Practical solving problems by using A3 report, problem-solving methodology, Value Stream analyses, Flow diagram, 5S concept – Introduction of Model Line project, SMED – Introduction of Model Line project – Introduction standard reporting systems – Introduction KAZEN shop and BIW system – Transferring successful solutions from other enterprises of the company (Best Practice Examples database) – Preparation of monthly reports for plant key figures – Participation in daily productions, logistics, engineering, meetings and global change processes February 2011/ August 2021
Volvo Trucks volvo.com Automotive Business — Cars, Trucks, Motor Transport, Buses, Trolleybuses (Manufacturing) Production engineer – Develop and introduce technological processes in manufacturing models – Develop instructions for operators‚ technological cards (based on (SPRINT, KOLA program) – Make changes in technological processes regularly by DCN (Design Change Notes) – Teaching operators and compiling instructions, receiving feedback – Develop the layout of placing of the equipment and the organization of workplaces – Calculate the Line capacities – Carry out control over manufacture‚ equipment use and quality of finished parts – Participate in new products, parts introductions, manufacture preparation – Optimize component delivery into the production line (by KIT, Downsize, Sequence) – Participate in daily productions, logistics, engineering, and meeting – Make reports regarding quality or assembly issues (PROTUS) – Problem Solving – Preparation of assembly line to meet a new product (New Truck Cab) May 2008/ February 2011

Education:

NWGU, Management of Organization, Manager 2003
KTZHT Vilonova, Telematics and Automaton in Railways , Engineer, 1998

Key skills:

Project milestones control, planning, quality, electronics R&D, ICT tests, SMD Line, soldering process, production, assembly, Line balancing, TMP, FMEA, Testing, Audits, Optimization of production line, Logistics flow, Kaizen , A3 report, Tech. cards, ACAD, Drawings