SK MIS, “Center-2” and “Krasnodar” branches
Construction Surveyor
October 2022 — August 2024
Monolithic construction work for apartment buildings in Zheleznodorozhny, a hotel complex in Ust-Labinsk, and a new terminal at Krasnodar Airport.
Duties included comprehensive geodetic support for the site:
— Preparation of layout, field, and as-built drawings.
— Layout of the structure and axles, installation of the embedded parts, anchor groups, and columns.
— Interaction with the geodetic service of the general contractor and the technical client.
— Surveying the formwork and completed structure.
— Conducting field commissions to hand over formwork and concrete to representatives of the general contractor and the technical client.
— Consolidation of the geodetic layout base.
Types of structures encountered: sand foundations, concrete preparations, pits, foundation slabs, beams, benches, parapets, columns (6, 10, and 20 meters), circular columns, embedded parts, anchor groups, tower cranes (Liebherr, Zoomlion), sleeves, walls of elevator and stair flights, interfloor slabs, stair flights, and floor slabs.
Used equipment: Sokkia SET530, Sokkia iM-105 (en), Leica TS06 Plus.
Software: AutoCAD and menuGEO.